accessible
close
small text
large_text
invert
info

Light Rail

Tel Aviv Green and Purple Lines

קווים ירוק סגול תל אביב
bt_left
bt_right

Design period: Since 2020 and ongoing

Client: Contractors’ partnership Construction tender preparation

Project location: Tel Aviv

General description: Preparation of a Design-Build tender for a contractors’ partnership of the Tel Aviv Green and Purple lines. The design deliverables included initial drawings and technical specifications for various systems.

Amy Metom's role on the project: The work covered all civil engineering disciplines including architecture, structures and landscape, structural design, electromechanical systems, firefighting, physical security measures, traffic and roadway structural design. Work the performed included all lines elements such as underground stations depot (3 sites) and more