Transportation Planning and Microsimulation

Study of basic alternatives for the Ayalon Corridor that includes 5 multimodal transportation centers and the execution of macro and micro transportation studies with the purpose of improving accessibility of the various modes of transportation to these centers (including public transportation and non-motorized and pedestrian traffic).

בדיקות תחבורתיות במרחב איילון

Ayalon District Transportation Studies

Since 2020 and ongoing

Transportation consultation for the Mayor of Haifa and the city's 2030 Administration.

ייעוץ למנהלת 2030 עיריית חיפה

Consultation for the Municipality of Haifa 2030 Administration

Since 2020 and ongoing

Transportation consultation and preparation of a strategic urban renewal document for the City of Bat Yam.

מסמך מדיניות להתחדשות עירונית בת ים

Bat Yam Urban Renewal Policy Document

2019-2020

Economic study for the Economics Planning Division of the Ministry of Transportation. Study of the economic feasibility of construction of grade separation at the intersection of Highway 44 with the railway track at Ramle.

בדיקה כלכלית לבחינת הקמת מחלף 210

Economic Study of Construction of the 210 Interchange

2018-2019

Economic study for the Economics Planning Division of the Ministry of Transportation. Study of the economic feasibility of revision of the statutory location of Highway 90 and upgrading of the eastern bypass of the City of Eilat. The study focused on the economic benefits of the upgrade.

בדיקה כלכלית לשדרוג כביש 900 והעוקף המזרחי

Economic Study of the Upgrade of Highway 90 and the Eastern Bypass

2020-2021

Transportation study performed for Yefe Nof Infrastructure & Transportation Company Ltd. The study examined the detailed design for implementing Metronit BRT Line 4 bus line between the MATAM Industrial Park and Lev Hamifratz Transportation Hub (including detailed design of priority signalling).

בדיקת מיקרוסימולציה לבחינת העדפה ברמזורים, מטרונית קו 4

Microsimulation Study of Signal Priority for Metronit BRT Line 4

2019-2020