Light Rail
Preliminary statutory and detailed design for the construction of approx. 20 km of light rail in cooperation with a foreign designer.
Jerusalem Green Line
From 2011 and ongoing
Detailed design of Infra 1 and Infra 3 works for approx. 6.5 km of at-grade alignment in Tel Aviv and Bat Yam. Construction works began in July 2017 and are expected to be completed in 2022.
Tel Aviv Red Line
from 2017 and ongoing
design of the approx. 3 km long Talpiot neighborhood segment. The line passes through Patt, Haparsa, Hatnufah and Pierre Koenig streets.
Jerusalem Blue Line Talpiot Segment
2020 and ongoing
The Brown Line will mainly serve the residents of East Jerusalem. The line begins at the Kalandia Checkpoint in the north, passes through Atarot, Beit Hanina and Shuafat and ends in the eastern CBD near the Flower Gate.
Jerusalem Brown Line
Since 2019 and ongoing
Preparation of a Design-Build tender for a contractors’ partnership of the Tel Aviv Green and Purple lines. The design deliverables included initial drawings and technical specifications for various systems.
Tel Aviv Green and Purple Lines
Since 2020 and ongoing