Infrastructure Development
Highway 6, Segment 21C
Design period: Since 2014 and ongoing
Client: Cross-Israel Highway Co. Ltd. (now TRI)
Project location: Negev – between the Shoket Junction and Nevatim
General description: Construction of a new route for Highway 6 south from the Shoket Junction to Nevatim, including numerous structural elements.
Amy Metom's role on the project: Design of 6 highway bridges, one of which is above Highway 25, 3 railway overbridges and 2 bridges over the Beer Sheva and Yatir streams. Design of signage gantries and 10 culverts of various sizes.
Similar projects