Heavy Rail
Doubling Coastal Corridor
Design period: Since 2011 and ongoing
Client: Israel Railways
Project location: Coastal plain
General description: Design of four tracks along the 23km section between Binyamina and Netanya of the Haifa-Tel-Aviv Railway - 250 kph high-speed and 160 kph suburban tracks.
Amy Metom's role on the project: Lead designer, utilities coordination and structural design
Similar projects