
Roadways and Interchanges
Highway 6 Segment no.18 from Iron to Ein Tut
Design period: 2001-2009
Client: Cross-Israel Highway Co.
Project location: Iron-Ein Tut
General description: Two-lane dual-carriageway freeway in the 16 km long Highway 6 segment between the Iron and the Ein Tut interchanges.
Amy Metom's role on the project: Preliminary design, preparation of the cities outline plan and steering its approval through the National Planning & Building Council (16 km); detailed design including coordination of the consulting team (11 km).
Similar projects